Free Training: Construction Schedule Risk Mitigation Strategies
Created for the standard UFGS 01 32 01.00 10 USACE scheduling specification, the templates come packed with various features to save you time and streamline your project workflow.
Set your USACE project up for success with P6 schedule template files designed specifically for the unique requirements of USACE projects.
Tailored for USACE: Designed specifically for U.S. Army Corps of Engineers projects, ensuring compliant scheduling.
Save Time and Money: Skip the tedious setup without building from scratch and use our templates for a solid foundation.
Schedule Templates per UFGS 01 32 01.00 10, updated August 2023:
Schedule Templates per UFGS 01 32 01.00 10, updated February 2015:
You receive 4 schedule template files for Primavera P6: a design-build and design-bid-build per the standard UFGS 01 32 01.00 10 specifications updated February 2015, and August 2023.
Quickly and easily verify your Primavera P6 Mandatory Requirements per the USACE standard scheduling specification with this fillable PDF checklist.
These templates are for construction contractors working on U.S. Army Corps of Engineers (USACE) projects.
They were built with consideration for the standard UFGS 01 32 01.00 10 scheduling specification often used in USACE projects.
We’re a small project controls firm specializing in military construction, with experience supporting multi-billion-dollar construction programs for USACE worldwide.
We’ve dedicated over 30 hours to develop these templates, ensuring compliance with the diverse and specific USACE scheduling requirements. This way, you don’t have to start from scratch.
These files were exported from Primavera P6 Professional, version 21. If you have an older version of P6, don't worry - you can easily change the version type to match your system. Your purchase includes a PDF guide that walks you through the three easy steps to upload the schedule files into any P6 version system.
Yes, you’re welcome to reach out to us if you have any questions or need assistance at connect@cpm-ss.com.
Immediately. After checkout, you’ll be directed to a page to download the schedule files. You’ll also receive an email with the link to download the files.
When you purchase any of our tools or templates, you’re protected by our 30-day money back guarantee. See the details on our Terms and Conditions page here.
Save time with these P6 schedule template files which incorporate key requirements from the standard UFGS 01 32 01.00 10 scheduling specification (updated as of 2023).
Included is a P6 template file for each example project:
“What I learned from this training was enough to get started right away.
“We were all very impressed by and appreciative of how relevant this training was for our current needs.
Exactly what we were looking for!”
– Government Training Attendee
'The Federal Scheduling Academy training courses have been (and will continue to be) a great resource for our team as we navigate the requirements for our USACE projects.
They have provided clear and applicable training modules for us to quickly understand and reference while setting up and analyzing our project schedule.'
– Contractor Training Attendee
“The training was well targeted, relevant, and concise given the breadth and depth.
I’ve had multiple conversations with several folks who agree and are excited to improve their ability to manage project schedules.”
– Government Training Attendee
Starting with a new software can be quite intimidating, and Primavera P6 is no exception, especially if you're a newcomer. Traditional training methods can involve lengthy sessions, travel, and...
How to Learn Primavera P6 Quickly: A Beginner's Guide
Successful alignment of the project schedule and quality control system ensures a smooth start of the first phase of the 3 Phase Quality Control system. Also, it enables accurate monitoring of...
USACE Series Part 2:
Schedule and Quality Control
USACE Series Part 1:
Schedule and Progress Payments
The Schedule of Values and Construction Schedule are combined into a single Cost-Loaded Project Schedule, used to determine progress payments and provide placement projections...
Free Checklist
As the government or contractor, quickly and easily confirm your USACE schedule’s cost loading compliance with the 01 32 01.00 10 scheduling specifications.
Free Cheat Sheet
Learn the 5 steps to link the schedule to the submittal register in RMS for USACE projects to improve visibility and minimize the risk of delays due to late or overlooked submittals.
Navigation
Legal
Offices located in West Granby, CT, and Forest Hill, MD
Founded in 2018 to specialize in schedule consulting and training for military construction.
Copyright 2024 CPM Schedule Solutions LLC. All Rights Reserved.
Contact Us
Published June 2021, Updated April 2023
Receive practical, actionable training and tools, including specialized templates and instruction for military and federal construction projects.
Have any questions?
We'd love to hear from you.
Get started for free with our collection of resources and in-depth articles on scheduling to enhance your success.
Feel confident in your project schedule by ensuring it’s reliable, contractually compliant, and utilized as a tool to minimize risk.
Whenever you’re ready, there are 3 ways we can help:
This blog is for general informational purposes only and is not to be considered an official interpretation or enforcement policy of the UFGS standard specifications. As individual project requirements vary, refer to your specific contract. See our Terms and Conditions and Disclaimer for additional information.