Pre-built P6 schedule templates to meet the unique requirements of the NAVFAC 01 32 17.00 20 scheduling specification, ready to go. Save time, stay compliant.
Tailored for NAVFAC: Designed specifically for the unique requirements of Naval Facilities Engineering Systems Command (NAVFAC) projects.
Save Time and Money: Skip the tedious setup without building from scratch and use our templates for a solid foundation.
Download and Use Immediately: Get started right away with our ready-to-use templates and kickstart your project.
You receive 2 schedule template files for Primavera P6: a design-build and design-bid-build per the standard UFGS 01 32 17.00 20 specifications, as of 2025 most recently updated November 2023.
P6 Schedule Template, Example Design-Build Project (.xer)
P6 Schedule Template, Example Design-Bid-Build Project (.xer)
Bonus: NAVFAC P6 Settings Checklist
Easily verify your Primavera P6 Mandatory Requirements for NAVFAC scheduling standards with this fillable PDF checklist - quick, simple, and hassle-free.
These templates are for construction contractors working on Naval Facilities Engineering Systems Command (NAVFAC)projects.
They were built with consideration for the standard UFGS 01 32 17.00 20 scheduling specification often used in NAVFAC projects.
We’re a small project controls firm specializing in military construction, with experience supporting multi-billion-dollar construction programs for U.S federal agencies worldwide.
We’ve developed these templates to help construction contractors in navigating what can be daunting scheduling requirements for NAVFAC projects. Our aim is to help contractors set up a solid foundation for success.
We’ve dedicated over 50 hours to develop these templates, ensuring compliance with the diverse and specific NAVFAC scheduling requirements. This way, you don’t have to start from scratch.
Additionally, we’re providing a NAVFAC P6 Settings checklist as a bonus so you can easily confirm your P6 settings comply with NAVFAC's requirements.
These files were exported from Primavera P6 Professional, version 21. If you have an older version of P6, don't worry - you can easily change the version type to match your system.
Your purchase includes a PDF guide that walks you through the three easy steps to upload the schedule files into any P6 version system.
Yes, you’re welcome to reach out to us if you have any questions or need assistance at connect@cpm-ss.com.
Immediately. After checkout, you’ll be directed to a page to download the schedule files. You’ll also receive an email with the link to download the files.
When you purchase any of our tools or templates, you’re protected by our 30-day money back guarantee. See the details on our Terms and Conditions page here.
Starting with a new software can be quite intimidating, and Primavera P6 is no exception, especially if you're a newcomer. Traditional training methods can involve lengthy sessions, travel, and...
How to Learn Primavera P6 Quickly: A Beginner's Guide
Successful alignment of the project schedule and quality control system ensures a smooth start of the first phase of the 3 Phase Quality Control system. Also, it enables accurate monitoring of...
USACE Series Part 2:
Schedule and Quality Control
USACE Series Part 1:
Schedule and Progress Payments
The Schedule of Values and Construction Schedule are combined into a single Cost-Loaded Project Schedule, used to determine progress payments and provide placement projections...
Free Checklist
Quickly confirm your USACE schedule’s cost loading accuracy and compliance, whether you're the government or contractor.
Navigation
Legal
Offices located in West Granby, CT, and Forest Hill, MD
Founded in 2018 to specialize in schedule consulting and training for military construction.
Copyright 2024 CPM Schedule Solutions LLC. All Rights Reserved.
Contact Us
Training
Receive practical, actionable training and tools, including specialized templates and instruction for military and federal construction projects.
Have any questions?
We'd love to hear from you.
Get started for free with our collection of resources, downloads, and in-depth articles, and paid templates.
Feel confident in your project schedule by ensuring it’s reliable, contractually compliant, and utilized as a tool to minimize risk.
Whenever you’re ready, there are 3 ways we can help:
This blog is for general informational purposes only and is not to be considered an official interpretation or enforcement policy of the UFGS standard specifications. As individual project requirements vary, refer to your specific contract. See our Terms and Conditions and Disclaimer for additional information.