Featured Project

OUR VALUE

CPM Schedule Solutions supports USACE through CPM schedule review and analysis, ensuring construction schedules are accurate, reliable, and proactively identifying risks, thereby reducing USACE’s exposures for cost and time impacts. 


We also perform delay and claim analysis to confirm, quantify, and proportion responsibility for delays with data-driven and objectively supported analysis. Additionally, we lead master integrated scheduling for the entire Tyndall construction program for tracking and visibility.


Location: Tyndall Air Force Base, Florida


Project Value: $1B+


Work Performed As: Subcontractor to ATI, Inc.

SERVICES PROVIDED 
BACKGROUND

U.S. Army Corps of Engineers, Mobile District

Construction Schedule Consulting, USACE Mobile District

  • CPM Schedule Analysis & Oversight
  • Delay and Claim Analysis
  • Master Integrated Scheduling

    USACE has been leading a massive rebuild at Tyndall Air Force Base after Hurricane Andrew in 2018. They’re not just restoring the base—they’re future-proofing it. The focus is on constructing resilient, modern facilities that can withstand future disasters while supporting the Air Force’s evolving needs. 


    By incorporating sustainable technologies and cutting-edge design, USACE is transforming Tyndall into a forward-thinking, mission-ready installation built for the long haul.

    Construction Schedule Consulting Army Corps Engineers

    Starting with a new software can be quite intimidating, and Primavera P6 is no exception, especially if you're a newcomer. Traditional training methods can involve lengthy sessions, travel, and...
    How to Learn Primavera P6 Quickly

    How to Learn Primavera P6 Quickly: A Beginner's Guide

    Successful alignment of the project schedule and quality control system ensures a smooth start of the first phase of the 3 Phase Quality Control system. Also, it enables accurate monitoring of...
    USACE Schedule and Quality Control

    USACE Series Part 2: 

    Schedule and Quality Control

    USACE Cost Loaded Project Schedule

    USACE Series Part 1: 

    Schedule and Progress Payments

    The Schedule of Values and Construction Schedule are combined into a single Cost-Loaded Project Schedule, used to determine progress payments and provide placement projections...
    RECENT ARTICLES

    Free Checklist

    CHECKLIST - USACE SCHEDULE COST LOADING

    As the government or contractor, quickly and easily confirm your USACE schedule’s cost loading compliance with the 01 32 01.00 10 scheduling specifications.

    USACE Schedule Cost Loading Checklist
      Small Business CPM Schedule

      Navigation

      Legal

      EnvelopeFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)

      Offices located in West Granby, CT, and Forest Hill, MD

      Founded in 2018 to specialize in schedule consulting and training for military construction.


      CPM Schedule Solutions LLC

      Copyright 2024 CPM Schedule Solutions LLC. All Rights Reserved.

      Contact Us

      Blog Title

      Published June 2021, Updated April 2023

      Training + Tools


      Receive practical, actionable training and tools, including specialized templates and instruction for military and federal construction projects.

      Have any questions? 

      We'd love to hear from you.

      Check CircleFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)
      Check CircleFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)
      Check CircleFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)

      Blog + Free Resources


      Get started for free with our collection of resources and in-depth articles on scheduling to enhance your success.

      Consulting


      Feel confident in your project schedule by ensuring it’s reliable, contractually compliant, and utilized as a tool to minimize risk.

      Whenever you’re ready, there are 3 ways we can help:

      This blog is for general informational purposes only and is not to be considered an official interpretation or enforcement policy of the UFGS standard specifications. As individual project requirements vary, refer to your specific contract. See our Terms and Conditions and Disclaimer for additional information.